Members Page
« Back
Premier Modular Limited

Premier Modular Limited

Contact: Customer Services Tel: 0800 316 0888 Mobile: 01964 545000 Fax: 01964 545001 Email: sales@premiermodular.co.uk Website: www.premiermodular.co.uk

Catfoss Lane
Brandesburton
Driffield
East Yorkshire
YO25 8EJ


With 60 years of experience in off-site construction, Premier Modular Limited is a market leader in the design, manufacture and installation of modular buildings, designed to meet all current relevant building legislation, in many cases exceeding the required standards.

* Surety of cost and programme – Quick, minimal site disruption, reducing construction programmes.
* Environmentally Friendly – Sustainable, incorporating alternative energy sources.
* Less traffic onsite = reduces H&S risk.
* Reduced waste = reduced carbon footprints.
* Attention to detail – Our flexible, customer-focused approach gives us the edge when it comes to meeting the unique challenges presented by each project. Each building is subject to rigorous quality controls.
* One of the newest interchangeable hire fleets in the UK
* 6 storeys available as standard
* Gantry options available



Marketing Suite on Hire
Roundhay Primary School, Leeds
The Foundry Student Accommodation
Villa Place Social Housing
Temporary Multi Storey Welfare + Office
Healthcare - Cancer Care Ward
Rooftop Extension Student Accommodation
Rented Office Accommodation
Gantry Accommodation
Temporary Education Facilities
Marketing Suite on Hire
Roundhay Primary School, Leeds
The Foundry Student Accommodation
Villa Place Social Housing
Temporary Multi Storey Welfare + Office
Healthcare - Cancer Care Ward
Rooftop Extension Student Accommodation
Rented Office Accommodation
Gantry Accommodation
Temporary Education Facilities
Get Directions

“ I am writing to thank you and your team for the excellent and most heart felt support they have shown to my soldiers, sailors and airmen/women over the past few weeks. With an enthusiastic approach from your staff the cabins at these two locations were quickly erected and fitted out to a very high standard. Looking after the welfare of my troops is my highest priority after securing the perimeter fence with large military numbers deployed in pedestrian and vehicle search areas; your efforts have significantly contributed to that aim. ”

Snr Military Representative - 2012 Event

Southmead Hospital

Southmead Hospital

Southmead Hospital

Premier Modular completed a contract worth nearly £8m, as part of advanced works for a new super hospital in North Bristol The contract was awarded to Premier by virtue of the quick scheduled 24-week site programme which was only achievable using the company’s modern methods of construction.

 

Six buildings with over 5000m2 of accommodation were built using the PremierPlus building system with some of the buildings incorporating Premier’s factory installed concrete floor option.

The 127 steel-framed modules were manufactured in Premier’s controlled factory environment and were delivered by road and craned into position ready for the final stages of fitting-out on site.

This process significantly reduced disruption to staff and visitors to the hospital site by reducing site traffic and providing a completed building in a much shorter time frame when compared to traditional building methods.

The buildings included new facilities for MRI, CT and X-ray, 3000m2 kitchen and cafeteria and new pharmacy and aseptic suite including the latest developments in automated picking for a 24hr prescription service. There was also an imaging suite, clinical engineering offices and a pharmacy, with a fully computerised robotic sorting system.



The Foundry, Newcastle

The Foundry, Newcastle

Selected as a preferred supply chain partner for the high quality of their product and process, Premier Modular Limited provided a 206 bedroom student accommodation block, The Foundry.

This high quality 5 storey building situated close to the city centre in Newcastle, consisted of a mixture of 54 studio flats, 150 en-suite bedrooms and 2 accessible en-suite bedrooms with associated shared living spaces and kitchens and was constructed in a 42 week site programme.

Driven by an immovable programme requirement of a September student intake, Premier worked in partnership with the main contractor, efficiently manufacturing 300 modules fully fitted out and decorated in the factory - an excellent demonstration of the enormous time benefits realised by using the Premier off-site system. Significantly the foundations and demolition commenced on site whilst the modules were being manufactured – ensuring no time was wasted in the process.

The construction of the building uses a combination of products from the innovative Premier range, combining light gauge steel frame modules for the bedrooms, with heavier gauge steel modules for the larger open plan communal areas.



TIQ Fit Out Works

TIQ Fit Out Works

The International Quarter London is at the centre of Europe’s largest urban development, benefiting from over £12.5billion of investment to date. 

With an abundance of green space and fresh air, access to some of the world’s most forward-thinking cultural institutions and a workplace design that has employee wellbeing at its heart, The International Quarter gives people a place to move, breathe and think.

Premier transformed an existing 3 storey and 2 storey school building (covering 4,878m2) that was over 10 years’ old into a state of the art welfare facility and project office to accommodate 1200 operatives and 216 staff.  This challenging transformation required decorated walls and suspended ceilings throughout, LED lighting, installation of an air-conditioning and heat recovery system.  Curtain wall glazing was added to the board room with glazed walls provided for other meeting rooms and high quality floor finishes throughout.   A bespoke viewing deck accessible via the Board Room provided the finishing touch to this modern, spacious and inspirational accommodation.

 



Chelsea Barracks - Welfare and Office

Chelsea Barracks - Welfare and Office

Premier Modular Limited was appointed for the first phase of the prestigious £3bn development at Chelsea Barracks, which has been eagerly awaited by some of the world’s wealthiest.  Premier was asked to provide a 3-storey modular building consisting of 94 modules to accommodate welfare and office facilities on a 144 week hire period whilst the main construction works take place.

Premier’s solution was a building to cater for 1,500 operatives and 200 staff which included full medical facilities, canteen, drying rooms, toilets, meeting rooms, open plan offices and a state of the art viewing gallery that overlooks the main work on site. 

The modern methods of construction used by Premier meant the building could be installed efficiently and in a good timeframe ready to assist the construction of a long awaited, important development. 

Located in one of London’s most sought after postcodes, the development will see a 13-acre property that once housed the Queen’s Guard transformed to include up to 448 houses and flats, public spaces and an array of amenities such as retail areas, restaurants and a state of the art spa. The development of the site is being led by leading real estate company Qatari Dair on behalf of the Qatari Royal Family.

18th Apr 2017Premier Modular’s Housing Product Secures Approval under two Additional Warranty Approval Schemes

Maximising air-tightness.


Read More
21st Mar 2017Premier Modular shortlisted for two categories in the 2017 Construction News Awards

The two categories Premier Modular have been shortlisted for are:


Read More